FLIPgo

FLIPgo is Hyperliquid's Native Streaming Platform

  • 4,799 Raised
  • 2,768 Views
  • 3 Judges

Categories

  • 02. 🚀 Hyperliquid Frontier Track
  • 08. Best use of Privy
  • 07. Best Use of Liquid Labs

Gallery

Description

🔁 FLIPgo

FLIPgo is a Hyperliquid native streaming platform and social layer. It is the first streaming platform to fully combine and interconnect a streamer's social profile with a live comprehensive view of their onchain activity, and the first to integrate perps trading into a streaming social layer. FLIPgo provides a platform for Hyperliquid's culturally cohesive community to converge and transforms streaming into an interactive, high stakes live trading experience by merging markets with social engagement. Instead of passively watching streams, viewers can engage with traders, influence outcomes, and participate directly in trading activity.

Hyperliquid provides the ideal foundation to build FLIPgo, because of its infrastructure and highly engaged community, making it the right environment to combine streaming with trading. 


Intention:

Crypto has moved through a number of distinct epochs and is more recently entering the social sphere through social media integrations and account abstraction. The need for social layers is clear. By merging crypto’s hyperfinancialised nature with a social usecase, we can unlock a new wave of participants.

A few crypto native streaming platforms have appeared, including pumpfun, Abstract and Retake, but most focus on hyperdilutive launchpad-associated microcap token trading, and neither have managed to provide a connecting layer between the offchain identity of a streamer and their onchain presence. This lack of connection creates a short lived entertainment loop with little reason for viewers to keep engaging or to hold a creator’s token.

FLIPgo takes a different path. It makes high leverage perps trading the centre of the experience and integrates Hyperliquid’s infrastructure directly into profiles and streams. Each profile carries a live onchain footprint, linking social presence to financial performance and activity. 

FLIPgo is a social layer for the Hyperliquid community, a medium where users can grow the ecosystem through direct onchain and offchain communication and content across technical, social and cultural lines.



🛠️ How It Works

FLIPgo integrates Hyperliquid’s Core and EVM directly into a streaming interface. Streamer profiles display real-time positions, open orders, historical PnL, and asset holdings such as tokens and NFTs, linking onchain activity into part of their social identity.

Core Features:

  • Live positions, open orders, and PnL integrated into streamer profiles and streaming interface

  • FLIPgo native social profiles for identity and discovery

  • Toggle between Hypercore and HyperEVM to see both perps and token + NFT activity

  • Integrated chatbox for real-time audience interaction

  • Tip and message overlay displaying viewer contributions live on stream

  • Trader vaults where viewers can deposit capital and watch it managed live

  • X profile integration using Privy to link trading performance with social presence

  • Create streamer tokens using LiquidLaunch's token launchpad infrastructure

  • Trade the flippening using Pear Protocol to go long/short without opening 2 positions

Supporting Features:

  • Trading tab powered by Liquid Labs’s Liquidswap Aggregator

  • Built-in bridge tab for seamless transfers to HyperEVM using DeBridge

  • Token Explorer page with live data from the Dexscreener API

In the Pipeline:

  • Token-gated rooms for exclusive trading rooms (pay to play - copytrade elite traders live)

  • Profile leaderboards for a number of categories including: Cumulative PnL, Vault TVL, Most Vault Deposits, Most Tipped and Most Viewed

Technical Highlights:

  • React and Next.js for front-end development

  • PostgreSQL and Redis for data storage

  • Docker with Kubernetes for deployment

  • Prometheus for monitoring and analytics

  • Livepeer for video encoding and transcoding

  • Nginx as the single entry point, managing traffic routing, SSL termination, WebSockets, and streaming protocols



💻 Demo

https://www.youtube.com/watch?v=MBC0ECgZ8Uc 



📂 Project Links

- Code: Private

- LIghtweight Repo Access Provided to @HL-Hackathon: Github

- Designs / Visual Assets: Google Drive

- Docs: Gitbook

- Live demo URL: Youtube


👥 Team

Co-founder & Project Lead: @DefiSummer2020

Co-founder & Lead Dev: @CyberSteinAO


Attachments